Building projects completed using this product: COMAIN Hand-held Formwork
    

List of Works

 
Sulfuro Primario de Cerro Verde Project

Sulfuro Primario de Cerro Verde Project

AREQUIPA, Peru

 

 

The Sulfuro Primario de Cerro Verde Project is a macroproject for the expansion of the Cerro Verde mine, which has the objective of tripling copper production.Experience gained from the Toquepala Project was of great help to ULMA Construcción when confronting the new challenges posed by this work. It is also worth mentioning that the largest construction companies in Peru participated in this project.The project encompassed the construction of the first, second and third crushers, Silos, Mills, Flotation System, Grinder, Recycling Chamber, Filters, Warehouses, etc. Some of the most important structures to be specially considered are the silos, which are 41 m high structures with an area of 1625 m2, and the mills, which are large block structures of 5 m high and within an area of 1550 m2.

See detail

 

 

Ile Eco Life

Ile Eco Life

SÃO PAULO, Brazil

 

 

This is a residential complex of great magnitude with 90,000 m2 constructed.The structural solution chosen was ribbed or voided slab with an inside distance of 61 cm x 61 cm.

See detail

 

 

Construction Work for the Primary Crushing Leachable Deposits Formation Project at Toquepala

Construction Work for the Primary Crushing Leachable Deposits Formation Project at Toquepala

TOQUEPALA - TACNA MINE, Peru

 

 

The Leachable Deposits Formation Project is part of the Toquepala mine modernization plan. The primary structure is the Crushing Building, which has the mission of crushing the large volumes of minerals hauled to the building. The Primary Crushing building stands 41 m tall and covers a surface area of 390 m2. The crushing building was divided into two zones: the primary zone includes the main slabs (three total) and is divided into four levels, while the secondary zone includes the auxiliary slabs (four total) and is divided into four levels. The Primary Crusher also included the 41 m high cut-off wall construction with total slurry wall surface area of 1,800 m2. Approximately 7,000 m3 of concrete was poured in the crusher building.

See detail

 

 

Biological Research Center (Complutense University of Madrid)

Biological Research Center (Complutense University of Madrid)

MADRID, Spain

 

 

This was the project for constructing a building in which the laboratories of the New Biological Research Center would be installed to complement the Universities current facilities.

See detail

 